Custom-built, life-size exhibits engineered to your venue — your dimensions, your movement set, your control type.

An orca is read from its contrast — the glossy black back with the white belly and the…
View Product
One penguin reads as a toy. Five, at different heights, with one bent over and one mid-waddle, read…
View Product
A Mosasaurus is the one marine reptile that makes an aquarium hall feel like open water. It is…
View Product
A shark is a suspended piece, not a standing one, and that single fact changes every part of…
View ProductMost marine builds hang rather than stand. That single fact reorganises the whole brief: the load goes into the ceiling, the viewing angle is from below, and the rig that holds the animal is a bigger design problem than the animal.
Frames are 316L stainless steel, not mild steel with a coating. An aquarium hall combines humidity with salt, and a standard frame inside a fibreglass shell rusts from the inside out — the shell looks perfect for years while the structure behind it fails. 316L is standard on every marine build we make, and it is not an upgrade.
Suspended over a circulation route is the version that photographs best: four to six rigging points, each with adjustable tension, and the body set at ten to fifteen degrees nose-down with a slight roll so it reads as swimming rather than hanging. Where the ceiling cannot take the load, a floor plinth or wall bracket keeps the animal readable at the cost of the overhead effect.
Anything going over open water needs the tank specification declared at order — frame treatment, fixings and surface finish all differ from a dry-hall build.
The same questions we answer in email, published openly — sizing, cost drivers, technology and lead times.

The four parts that fail first, the weekly to annual service schedule, the spare kit that prevents closures, and what really sets service life.
Read Article
Planning ranges for power by figure size, what changes when actions are pneumatic, compressor and generator sizing, and the eight numbers worth specifying.
Read Article
Which details actually fail on an outdoor animatronic dinosaur, the IP ratings to specify by zone, and how wind, snow and cabinet placement decide whether it survives year five.
Read ArticleSend us the floor plan and ceiling or canopy clearance. As a rule of thumb, allow 1.5× the model's length as clear space so the movement reads properly and visitors can step back. We model the footprint in 3D before you commit.
30–45 days for the build itself, once drawings and material samples are approved. Add crating, ocean or air freight and on-site installation — you get a dated schedule before the deposit, not after.
Yes, if it is specified for it. Outdoor builds get corrosion-protected Q235 frames and sealed electrical enclosures, rated from −20°C to +60°C. Indoor-only models are cheaper — we will tell you when you do not need the outdoor spec.
An installation manual, wiring diagrams, a spare-parts list and a maintenance guide — plus a 12-month warranty with maintenance support and remote troubleshooting for control and drive issues.
Send us your venue, species list and rough dimensions. You'll get a realistic feasibility read and a ballpark lead time — no pressure, no template replies.
Or email info@hltdino.com — we reply within one business day.